Glowworm 30sxi user manual


















Hand Tools. Tool Storage. Domestic Gas Forms. Non Domestic Gas Forms. Essential Forms and Pad Sets. Business and Construction Forms. Electrical Forms. Plumbing Forms. Carry Cases. Boulter Buderus. Heatline Spares. ICI Caldaie. Saunier Duval. Worcester Bosch. Control Box. Expansion Vessel. Oil Filters. Oil Gauges. Oil Lines. Photo Cells. Tiger Loops. DAB Pumps. For more information see our Privacy policy.

My settings Decline Accept. We use cookies to give you the best experience on our websites and improve our services.

You can find detailed information about cookies in our Privacy policy. Please select your cookie preference below: Essential Cookies Always active. Performance Cookies. Marketing Cookies. Save my settings Decline Accept. Homeowner Repairs and Servicing Literature. Boiler Manuals and Literature Downloads All of Glow-worm's boiler and control product literature, collected together in one place. Search Search In GB the minimum acceptable siting dimensions for the terminal from obstructions, other terminals and ventilation openings are shown in diagram 4.

In IE the minimum distances for flue terminal positioning must be those detailed in I. The terminal must be exposed to the external air, allowing free passage of air across it at all times. Being a condensing boiler some pluming may occur from the flue outlet. This should be taken into consideration when selecting the position for the terminal. Carports or similar extensions of a roof only, or a roof and one wall, require special consideration with respect to any openings, doors, vents or windows under the roof.

Care is required to protect the roof if made of plastic sheeting. If the carport comprises of a roof and two or more walls, seek. These dimensions comply with the building regulations, but they may need to be increased to avoid wall staining and nuisance from pluming depending on site conditions.

NOTE: If the flue terminal is positioned near a light source insects may enter the flue system. Where safe and practical to do so advise the homeowner to check the flue outlet and clear visible insects from the terminal end. A terminal guard is required if persons could come into contact with the terminal or the terminal could be subject to damage.

If a terminal guard is required, it must be positioned to provide minimum of 50mm clearance from any part of the terminal and be central over the terminal. The guard should be similar to that shown in diagram 4. A suitable guard is manufactured by: -. This boiler is designed for use as part of a sealed water central heating system with fully pumped circulation.

An options board accessory is available to link the internal programmer with a Honeywell S or Y plan system. The safety valve is an integral part of the boiler and it cannot be adjusted. The pipe from the safety discharge valve must not discharge above an entrance, window or any type of public access area.

The boiler has an integral expansion vessel with a capacity of 8 litres 1. NOTE: The expansion vessel volume depends on the total water system volume and the initial system design pressure.

In IE , current edition of I. The flow rate through the boiler must not be allowed to fall below that given in section 1 - Specification Table. The boiler is fitted with an automatic bypass which can be adjusted to suit your system requirements.

Ensure that under no circumstances does the flow rate drop below the figure specified, refer to section 1 - Specification Table. Provision for filling the system at low level must be made, see diagram 5. There must be no permanent connection to the mains water supply, even through a non-return valve.

NOTE: It is important that fittings used for connection to potable water comply with the water undertakings requirements. Draining taps must be provided at all the low points of the system, which will allow the entire system to be drained. Drain points for the appliance are provided at the positions shown in diagram 8.

The domestic hot water cylinder must be of the double feed indirect coil type. It must be suitable for working at a gauge pressure of 0. New system- For optimum performance after installation, the boiler and its associated central heating system should also be flushed. Flushing should be carried out in accordance with BS using a cleanser such as Sentinel X or X, Fernox Restorer or Salamander corrosion guard cleaner.

For long-term corrosion protection, after flushing, an inhibitor suitable for stainless steel exchangers should be used, refer to the current issue of BS and BS on the use of inhibitors in central heating systems.

Please check the contents of packs as shown in diagram 6. The packs are located in the top polystyrene packing. Remove the carton sleeve and top pack then lift the boiler and its polystyrene base support out of the lower pack. The boiler mounting wall should be suitable for the weight of the appliance and be true and flat. NOTE: Due to the varied site conditions we do not supply fixings and advise that the installer should supply those which are suitable.

Take the wall template from the document pack located within the top polystyrene packing and place in the desired position on the wall, giving due consideration to the required boiler clearances, see section 3, and the flue you are fitting. Mark the position of the flue centre, if fitting a side flue, extend the flue centre line into the corner then mm along the adjacent wall, see diagram 6.

For extended side flues, the flue hole centre should be determined by extending the dashed inclined line on the template to the side wall. Where this line reaches the side wall, a horizontal line should be marked.

The vertical centre line of the flue should then be marked at mm from the back wall. To allow for the flue passing through the wall at this angle a mm hole should be drilled irrespective of internal or external installation. If flue extension pipes are to be used then a core drill size of mm is required.

The Wall Hanging Bracket is supplied in the main boiler packaging at the rear of the boiler. Reposition the wall template over the flue hole and mark the position of the fixing holes for the hanging bracket, see diagram 7. Lifting the boiler into position, lean the top of the boiler slightly to the wall and position just above the hanging bracket. Lower the boiler slowly and engage onto the hanging bracket, see diagram 7. NOTE: The appliance may contain a small amount of water, place a water container beneath the boiler connections.

Assemble and secure the pre formed copper tails to their respective isolation valves making sure of their correct orientation, see diagram 8. There are flats on the body of the valves for locating a spanner to aid tightening to copper tails. NOTE: Make sure that the test and drain points are accessible, refer diagram 8. Plumb the system pipe work to the copper tails. NOTE: Do not subject the isolation valves to heat. Flush out the heating system before connecting to the boiler, refer to section 5.

The whole of the gas installation, including the meter, should be inspected, tested for tightness and purged in accordance with the current issue of BS and in IE the current edition of I. This must be extended, using not less than 15mm o. The pipe must have a continuous fall and be routed to a position so that any discharge of water, possibly boiling, or steam cannot create any danger to persons, damage to property or external electrical components and wiring.

To ease future servicing it is advisable to use a compression type fitting to extend the safety discharge valve tube. The condensate drain connection is behind the pump at the rear of the boiler, see diagram 9. A flexible condensate outlet pipe is fitted and should be used to couple the condensate trap and siphonic drain to a 22mm to 25mm O.

NOTE: the pipe should have a fall of a least 2. The maximum permissible horizontal flue length is 10 metres plus the flue terminal assembly, this can be achieved by use of the accessories, see diagram However should an additional 90 o or 2 x 45 o elbows be used then the length MUST be reduced by 1metre.

When extension pipes are used the flue system must be designed to have a continuous fall to the boiler of at least 2. The flue can be installed from inside the building, when access to the outside wall face is not practicable. The flue length must be calculated and installed according to the relevant standards EN and 2 C43 flue systems only with reference to the table below and the manufacturers instructions supplied. The appliance maximum flue length must be included when calculating the overall design of the flue system.

Welcome to ManualMachine. We have sent a verification link to to complete your registration. Log In Sign Up. Forgot password? Enter your email address and check your inbox.

Please check your email for further instructions. Enter a new password. Ultracom sxi. Glow-worm Ultracom sxi User Manual Download for 1. Ultracom Installation and Servicing 18sxi G. Guarantee Registration Thank you for installing a new Glow-worm appliance in your home.



0コメント

  • 1000 / 1000